Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
  • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
  • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
  • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
  • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
  • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
  • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
  • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
  • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
  • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
  • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
    • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
    • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
    • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
    • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
    • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
    • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
    • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
    • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
    • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer
    • Foxwell NT630 ABS Airbag Reset AutoMaster Programmer

    Foxwell NT630 ABS Airbag Reset AutoMaster Programmer

    1. Provides accurate and professional diagnosis of ABS and airbag faults.2. Reads and clear codes and turns off ABS/Airbag warning indicator3. Compatible with both OBDI and OBDII cars, SUVs, minivans
    Item No. COBD22888
    5 stars, 9 reviews.
    In Stock
    Price:
    US$185.00/ piece
    Discount Price:
    US$143.00/ piece 23%
    Quantity:
      
    Shipping:
    Free ShippingAirmail Post
    Estimated delivery time: 7-45 working days.See details?
    Returns:
    Return for refund within 7 days,buyer pays return shipping.Read details »
    Support:
    Online Chat Ask a question
    Description
    Foxwell NT630 AutoMaster Pro ABS Airbag Reset Tool

    Foxwell Multi-System Scanner Function List
    This new NT630 scanner is just the perfect tool that professional mechanics can’t wait to have.

    Top 3 reasons to get this NT630 ABS tool:

    1. Can w
    orks on the latest 2012/2013 models
    2. Reads and clear codes and turns off ABS/Airbag warning indicator
    3. Retrieves ECU information
    Foxwell NT630 Vehicle Coverage:
    Area Manufacturer
    America Chrysler, Ford, GM
    Asia Acura, Au Ford, Daewoo, Honda, Holden, Hyundai, Infiniti, Isuzu,
    Kia, Lexus, Mazda, Mitsubishi, Nissan, Scion, Subaru, Suzuki,Toyota
    Europe Abarth, Alfa-Romeo, Audi,Bentley, BMW, Bugatti, Citroen,Dacia
    EU Ford, Fiat, Jaguar, Lancia, Land Rover, Maybach, Mercedes Benz, Mini, Opel, Peugeot, Porsche, Renault, Saab, Seat, Skoda,
    Foxwell NT630 Features and Benefits:
    - Coverage includes 48 manufacturers
    - Compatible with both OBDI and OBDII cars, SUVs, minivans,
    light-duty trucks sold worldwide
    - Requests and records live sensor data
    - Provides live data graphing
    - Merges graphs for easy and intuitive diagnosis
    - Performs bi-directional control tests, such as ABS motor test, actuator test and so much more
    - Supports all 10 OBDII test modes, such as live data, O2 sensor test, component test and more
    - Enhanced OBDII Mode 6 functionality
    - Code troubleshooters provide you faster and easier diagnosis
    - Multilingual menu options and code definitions
    - SD memory card for data backup and software update
    - As easy as 1-2-3 with large TFT color screen and menu-driver operations
    - Ergonomic design and ruggedly built for both shop and road tests

    Foxwell NT630 Specifications:
    Display: Backlit, 480*272 TFT color display
    Working Temperature: 0 to 60℃ (32 to 140℉)
    Storage Temperature: -20 to 70℃ (-4 to 158℉)
    External Power: 8-18 Volts powered by vehicle battery
    Dimensions: 200*130*40mm (L*W*H)
    Blow molding case: 330*220*80mm (LWH)
    Weight: 1.8KG

    Package list:
    1 pc x NT630 Scan Tool
    1 pc x User’s Guide
    1 pc x Memory Card
    1 pc x USB Cable
    1 pc x Diagnostic Cable
    1 pc x Blow molding case

    Tags: Foxwell
    Hot Selling
    New Arrival
    Home | New Arrivals | Specials | Contact
    Copyright 2026 @ auto-obd2-tools.com All Rights Reserved.